Five Government interventions that could reshape residential development

Overview

As things stand, there seems to be very little chance of the Government meeting its housing target of 1.5m new homes by the end of this Parliament. The Government claims that its existing policies will help increase construction in the long term, including allowing development on Green Belt land.  However, critics argue that housebuilding is being held back by factors such as high construction and labour costs, and industry figures show that just over half the target number of homes are expected to be under construction by mid-2029.

In response, the Government is pursuing a combination of direct public-sector delivery, stronger protections for social housing, intervention in empty homes, higher-density development around transport hubs and more strategic regional planning. For investors, lenders and developers, the practical effects will be uneven: the reforms may unlock land and partnership opportunities, but could also increase competition for sites, impose new regulatory constraints and add further pressure to scheme viability.

EXPANSION OF THE COUNCIL HOUSING PROGRAMME

As explored in an earlier briefing, the prime minister has made council housebuilding a defining pledge of his government.  In his Manchester Speech in June 2026, he said that "No 10 North will oversee the biggest council house building programme since the post-war period". This pledge was reinforced in Burnham's party conference speech in Liverpool in September 2026 in which he explained that he specifically meant housing delivered and owned by local authorities as opposed to other social housing providers, on the basis that he believes in a "need to restore stronger democratic control over our housing stock.”

As a first step in meeting this promise, the Government has held back a portion of the first wave of funding under the £39bn Social and Affordable Homes Programme for councils instead of housing associations or housebuilders, and is said to be considering whether to make councils eligible for the £2.5bn low-cost loan scheme which was originally meant for registered providers.

Some have questioned these decisions, on the basis that registered providers have the capacity to build homes now whereas councils are generally seen as not being ready for the challenge at present.  For example, in 2024/25, councils built fewer than 2% of the new homes in England, and around half of councils owned no social housing stock.  Rebuilding the skills and organisational capacity needed to scale up delivery will therefore be a major test for Burnham's Government, particularly given ongoing fiscal pressures and workforce shortages.

Many councils themselves point to the financial difficulties that they are experiencing with their current housing stock, such as the costs of repairs exceeding rental income, the high cost of complying with housing regulations such as building safety and the Minimum Energy Efficiency Standards, and the upfront costs of development.  However, none of these barriers are insurmountable - possible partial solutions include the Government's Capacity to Build programme, and Steve Reed's proposals for a new state-owned developer which could borrow at lower rates than private developers and housing associations.

There is also a planning law dimension to direct council delivery. A local authority wishing to develop its own housing still requires planning permission to do so. Where the council is both applicant and local planning authority, proper governance separation of powers between the landowner applicant arm and the decision-making arm is essential and sensitive to navigate. In practice, politically contentious self-development proposals may be called in by City Mayors or the Secretary of State. This means that council-led delivery is not necessarily faster than private-sector delivery through the planning system.

Investor and lender implications

  • Partnership opportunities should expand. Councils are likely to continue working with private developers through land disposals, development contracts, mixed-tenure schemes and joint ventures.

  • Public-sector delivery may compete with private schemes for constrained inputs. In certain locations, council-backed projects could increase competition for development land, planning-resource capacity, construction labour and materials. This could affect site acquisition, construction costs, margins and delivery rates for private-sale schemes.

  • Funders should assess local-authority counterparties carefully. For joint ventures, forward-funding arrangements and development-management agreements, investors should consider the relevant council’s delivery capability, governance, financial position and ability to make timely planning and procurement decisions.

  • CIL and s106 obligations still apply. Local authorities are not automatically exempt from the Community Infrastructure Levy (CIL) on their own residential development and section 106 obligations attach to council-led schemes in the same way as private schemes. These costs should be factored into appraisals of council-led delivery or public-private joint venture proposals.

PROTECTING THE EXISTING COUNCIL HOUSING STOCK

The Social Housing Bill was introduced in May 2026, and is currently at Committee Stage in the House of Commons.  The legislation aims to protect existing stock, increase affordable supply, and enhance tenant safety.  In particular, it will reduce the number of social homes sold through the Right to Buy scheme, removing a disincentive for councils to build new supply, while maintaining a route to homeownership for eligible longstanding tenants through the 'Right to Acquire'.  The mechanisms for reducing this loss of social housing include increasing the qualifying period to buy a social home from 3 to 10 years; adjusting the percentage discount off the home's open market value; exempting tenants if they or their spouse owns other residential property; and introducing a 35-year exemption for newly built social homes.

The Bill also introduces a new requirement for private providers of social housing to notify the local authority and other registered providers in the local area before selling a home, in order to maximise opportunities to retain homes in the social housing sector.  The House of Commons Public Bill Committee has completed its line-by-line scrutiny of the Bill, which is expected to become law in the first half of 2027.

2 million
council houses have been sold since 1980 under the Right to Buy scheme

The Right to Buy scheme was introduced in 1980 to enable secure tenants of local authority housing to purchase their homes at a discount. Since its introduction, more than two million homes have been sold through the scheme. However, many of the homes sold under the scheme have not been replaced, depleting social housing stock.

Investor and lender implications

  • Disposals by registered providers may take longer. Private registered providers—including not-for-profit and for-profit housing associations—would need to give eight weeks’ notice to local authorities and other local registered providers before disposing of homes outside the regulated social-housing sector. This will need to be reflected in transaction timetables, asset-management plans and funding assumptions.

  • Councils will have greater scope to work with social housing providers on homelessness. The Bill would give councils powers to refer homeless households directly to private registered providers, with the intention of reducing reliance on costly temporary accommodation.

  • Private Rented Sector demand dynamics may change locally. By tightening Right to Buy and slowing the transfer of social homes into private ownership, the Bill may reduce the flow of lower-income households into the private rented sector.

  • Existing and future section 106 affordable housing obligations may need review. Many section 106 agreements contain cascade mechanisms or disposal provisions that allow registered providers to sell affordable housing units in certain circumstances. The pre-notification and disposal restrictions in the Bill may interact with or override those contractual provisions. Funders involved in forward-funded affordable housing schemes should review existing section 106 obligations for any disposal conditions, nomination arrangements or longstop provisions that may be affected. New section 106 agreements should be drafted with the Bill's requirements in mind.

MAKING IT EASIER FOR COUNCILS TO TAKE CONTROL OF EMPTY HOMES

Empty Dwelling Management Orders (EDMOs) are statutory powers created under Chapter 2 of Part 4 of the Housing Act 2004 in England.  They allow councils to take over the management (but not the ownership) of long-term empty homes for up to seven years to bring them back into occupation.  The EDMO regime involves several layers of protection for property owners, for example there are special rules for when homes are empty following bereavement; and the council must always get approval to make an interim EDMO (which is the first stage of the process) from a tribunal.  The tribunal must be satisfied that there is a reasonable prospect of occupation. EDMOs have not been used frequently and tend to be seen as a ‘last resort’ where talks between councils and property owners have failed.

542,276
The number of empty homes in England, according to recent Government figures
~100 EDMOs
An estimated number of EDMOs that have been issued across the entire country over the past decade.

On 27 September 2026, the Government announced reforms to EDMOs intended to decrease the number of empty dwellings.  The changes will reduce the period a property must be empty before it becomes eligible for an EDMO from two years to six months; and streamline the application process by removing evidential requirements for councils relating to issues such as anti-social behaviour or community support for intervention.  The Government presented the reforms to Parliament in September in the form of the Housing (Empty Dwelling Management Orders) (Prescribed Period of Time and Prescribed Requirements) (England) (Amendment) Order 2026 and these came into force on 5 November 2026.

These reforms represent a change to eligibility timing but landowners should not assume that the new regime will open the door to local authorities taking controls of high numbers of vacant homes  - the tribunal will still need to be satisfied that the requisite statutory conditions have been met. In addition, the new regime will not apply to applications for authorisation of an interim order submitted to the tribunal before 5 November 2026, which means that the change in empty dwelling management practice may only become visible after councils reassess and review their policies and cases post implementation.

Investor and lender implications

  • The enforcement threshold will be materially lower. Previously, landlords could often avoid EDMO action where a vacant property was secure, tidy and not causing disturbance. Removing these evidential hurdles may make it easier for councils to apply for orders based principally on prolonged vacancy.

  • An EDMO can materially affect asset control and lender risk. If an order is made, the council can manage the home for up to seven years, select occupiers, undertake maintenance and retain rental income to recover running and refurbishment costs. While ownership remains with the landlord, the owner loses significant control over lettings, management and pricing. The order may also complicate financing, insurance, sale processes and compliance with superior-lease or mortgage terms.

  • Vacant-asset management should become a formal risk-control process. Owners facing possible EDMO action should assess available exemptions, retain evidence explaining the vacancy, document active asset management and maintain records of repair, security and insurance arrangements. Constructive engagement with the relevant local authority will also be important.

  • Bringing an empty home back into use will not always be straightforward from a planning perspective. Where a dwelling has been vacant for an extended period, its lawful use may have been abandoned or become uncertain. In those cases, or where physical works are required that amount to development, a planning application or certificate of lawful use may be needed before the property can be re-occupied. Owners subject to EDMO risk should take planning advice early.

  • Cumulative impact of EDMOs and Council Tax. The EDMO reforms sit alongside existing financial disincentives. Local authorities already have power to charge a 100% council tax premium on long-term empty dwellings under the Local Government Finance Act 1992. For investors managing larger vacant residential portfolios, the combined effect of the premium and the lower EDMO threshold creates a materially more interventionist regime.

INCREASING HOUSING DENSITY AROUND WELL-CONNECTED STATIONS

The National Planning Policy Framework (NPPF) is the national planning policy published by the Government. It contains the Government’s planning policies for plan-making and for making decisions on development proposals in England, and sets out how these are expected to be applied on a local level. The NPPF is a material consideration for local planning authorities when they create local plans and make decisions about planning applications. Decisions on planning applications must be made in accordance with the development plan (which includes the local plan) under section 38(6) of the Planning and Compulsory Purchase Act 2004, unless material considerations – including the NPPF – indicate otherwise.

A revised version of the NPPF was published by the Government in August 2026 and introduced a key change which seeks to fast-track housing construction around England's transport hubs and stations, formally introducing into policy what the Government describes in its press release of 17 August 2026 as: “a default ‘yes’ for homes within reasonable walking distance of well-connected stations, alongside new minimum expectations for how much housing should be built in these areas”.  A "well-connected station" is defined by the new NPPF as a railway station or underground, tram or light rail stop which satisfies both of the following requirements:

  1. Top 80 TTWAs: It is located within a top 80 Travel to Work Area located partially or fully within England, ranked by Gross Value Added; and

  2. Minimum service frequency: In the normal weekday timetable, it is served — or has a "reasonable prospect" of being served due to planned upgrades or through agreement with the rail operator — throughout the daytime by at least four trains or trams per hour overall, or at least two trains or trams per hour in any one direction.

Once a station qualifies as "well-connected", the NPPF permits residential and mixed-use development where all four of the following limbs are satisfied:

  1. The development would be within "reasonable walking distance" of the well-connected station — defined as around 800 metres, or around 10 minutes' walk time if topography, route availability and quality, or physical barriers would prevent or discourage walking from up to 800 metres away. Where only part of a site falls within the reasonable walking distance, these provisions apply only to that part;

  2. The development would be "physically well-related" to the station or the settlement within which the station is located;

  3. The development would be of a scale which can be accommodated taking into account the existing or proposed availability of infrastructure; and

  4. The development would not prejudice any proposals for long-term comprehensive development in the same location.

Where those four conditions are met, a minimum density of 35 dwellings per hectare must be achieved within the net developable area of the site. A higher minimum of 45 dwellings per hectare applies where the service frequency is at least twice the minimum required for a well-connected station. Those minimum densities should be exceeded where possible, particularly in areas of high connectivity. Exceptions to both thresholds are limited to: (i) sites falling below the major development threshold (fewer than 10 dwellings or under 0.5 hectares) where meeting the standard can be demonstrated to be inappropriate or not possible; and (ii) traveller sites.

Where such sites fall within or adjacent to designated Green Belt, proposals are also likely to need to satisfy the NPPF "Golden Rules" for development on Green Belt and Grey Belt land. Under those rules, sites released from the Green Belt are expected to deliver at least 50% affordable housing, with a specified proportion as social rent, alongside infrastructure contributions and improvements to public access to green space. The interaction of this affordable housing requirement with the minimum density standards and transport-infrastructure contributions may create acute viability pressure on qualifying Green Belt sites.

Investor and lender implications

  • The policy may improve the prospects of higher-density schemes in well-connected locations. This is particularly relevant to developers, Build to Rent investors and land promoters seeking to bring forward sites close to established or improving public-transport infrastructure.

  • Eligibility must be tested at site level. Developers will need to consider whether all or only part of a site falls within the qualifying walking distance, particularly where they seek to rely on the default “yes” position for an entire scheme.

  • Transport proximity will not remove wider planning or viability constraints. Proposals must still address infrastructure capacity, demonstrate an appropriate physical relationship with the station, respond to site-specific constraints and comply with other NPPF policies.

  • The default "yes" is a policy presumption, not a guarantee of consent. The development plan retains primacy under section 38(6) of the Planning and Compulsory Purchase Act 2004. Where a local plan contains policies that conflict with a proposed transit-oriented scheme – for example, on design, heritage, ecology or flood risk – the NPPF policy will need to be weighed against those policies in the planning balance. Whilst the presumption in favour of granting planning permission may be strong, but it is not a certainty.

  • Implications of local housing supply. Where a local planning authority cannot demonstrate a five-year housing land supply or is failing the Housing Delivery Test, the NPPF's presumption in favour of sustainable development (the "tilted balance") will apply in addition to the transit-oriented development policy. Sites in those authority areas may benefit from a double policy tailwind.

  • Funders should test density-led viability carefully. Higher density may improve land efficiency, but can also increase build complexity, infrastructure requirements, affordable-housing exposure and reliance on local sales or rental values.

  • Green Belt sites will carry an additional viability burden. Where the transit-oriented development policy is relied upon for sites released from the Green Belt, the Golden Rules (including 50% affordable housing and infrastructure and green space requirements) will apply concurrently. Developers and funders should model the cumulative impact of density requirements, affordable housing obligations and infrastructure costs at feasibility stage.

  • Existing permissions may benefit from the policy. Developers with extant planning permissions near qualifying stations should consider whether the transit-oriented development policy supports an application under section 73 of the Town and Country Planning Act 1990 to vary conditions and increase density (if that is something worth exploring to improve the viability of that site).

MAKING PLANNING FOR HOUSING REGIONAL NOT LOCAL

Andy Burnham's well-publicised commitment to devolution means that the role played by local and regional authorities in delivering infrastructure may increase over time. England has yet to feel the impact of the English Devolution and Community Empowerment Act 2026, which will shift planning powers away from locally driven decision-making towards a more strategic, regional approach to growth, infrastructure, and land use.

For example, a recent study suggests that England’s devolution programme could boost the delivery of affordable homes in rural communities, provided that rural priorities are embedded in local strategies and supported by national safeguards. This is because devolution will give local leaders new powers over housing, planning, and investment.

Strategic Authorities, of which Mayoral Strategic Authorities will have the most far reaching and flexible powers, will be required to develop 'Spatial Development Strategies' (SDSs) to enable strategic planning across local authority boundaries. It is thought that this will allow greater scope for bringing forward larger-scale projects, but developers will need time to adjust to a new tier of strategic authorities and varying local rules. Seen alongside the new National Scheme of Delegation, the new regime may also be perceived as weakening democratic scrutiny of planning decisions.

The legal status of SDSs within the development plan hierarchy is critical. The London Plan provides the established precedent: it forms part of the statutory development plan for every London borough under the Greater London Authority Acts and must be given primacy in decision-making under section 38(6) of the Planning and Compulsory Purchase Act 2004. If SDSs adopted by other Mayoral Strategic Authorities are given equivalent status – forming part of the development plan for each constituent local authority area – this will fundamentally restructure decision-making outside London. Strategic site allocations in an SDS would carry development plan weight, not merely the weight of a material consideration. For land promoters, securing recognition of a site as a strategic growth location at the SDS stage will therefore be decisive.

The National Scheme of Delegation will also have practical implications for decision-making. By shifting a wider category of planning applications from committee to officer-delegated decision, the Scheme is intended to reduce delays and inconsistency. For developers, this reduces the risk of committee override of officer recommendations on policy-compliant schemes, but also removes a political pressure point that can sometimes be used to secure consent for marginal proposals. It will also change the decision-making record that is available for judicial review, as challenges to officer-delegated decisions involve a different factual and procedural matrix than challenges to committee decisions.

Investor and lender implications

  • Planning will become more strategic and regional. SDSs will provide a long-term, sub-regional framework for growth, housing, employment land and infrastructure. For land promoters and developers, it will become particularly important to secure recognition of a site as a strategic growth location at the SDS stage.

  • Mayors will have greater influence over strategically significant projects. The 2026 legislation gives Mayoral Strategic Authorities housing and strategic-planning functions, including powers relating to potentially strategic planning applications, development orders, land acquisition and development, and mayoral development corporations.

  • Infrastructure-led development may become more deliverable where it aligns with regional priorities. Devolved authorities will control or influence more transport, housing, regeneration, skills and growth funding. Their long-term growth strategies may help unlock schemes dependent on rail, roads, buses, utilities, remediation or land assembly. Conversely, sites that do not support regional growth, transport, affordable-housing, brownfield-first or net-zero objectives may be less likely to secure consent.

  • Regional infrastructure charges could affect viability. Mayoral Strategic Authorities may be given a Mayoral CIL power. Where adopted, this may create an additional regional levy alongside existing CIL, section 106 obligations, affordable-housing requirements and site-specific infrastructure costs. Developers and funders should test viability assumptions against both local and strategic-authority policy. The cumulative levy exposure in Mayoral Strategic Authority areas could be significant. The Mayor of London already operates Mayoral CIL (MCIL2). If other Mayoral Strategic Authorities acquire equivalent powers, developers would face: (1) Mayoral CIL; (2) local CIL (where adopted by the relevant local authority); (3) planning obligations under section 106 agreements (including for example financial contributions, affordable housing, local labour, site-specific infrastructure and biodiversity net gains requirements); and (4) the Building Safety Levy. These obligations are assessed cumulatively for viability purposes under the NPPG, but the addition of a new regional tier will complicate that assessment and increase the scope for viability disputes at application stage.

  • Public-private regeneration partnerships may become more common. Mayoral Development Corporations (MDCs) and enhanced powers of land acquisition and development could help authorities assemble land and deliver large regeneration areas. This may create joint-venture, development-management and disposal opportunities, especially for brownfield, town-centre and major housing sites. However, it may also mean public bodies exercise greater influence over land control and development requirements. Where an MDC is designated over an area, it replaces the relevant local planning authority as the decisionmaker for the designated area. This is not merely an advisory or strategic overlay – the MDC becomes the LPA for development management purposes. Developers operating within MDC areas deal with a single strategic body, which can streamline consenting but also concentrates risk if the MDC's priorities diverge from those of the developer. The London Legacy Development Corporation, Old Oak and Park Royal Development Corporation and, more recently, the Oxford Street Development Corporation are the established precedents.

  • The transition period will create execution risk. Developers may face changing planning teams, emerging local-plan positions, revised political priorities and uncertainty around decision-making routes. National policy points towards England-wide strategic-planning coverage, but SDS regulations, geography and implementation arrangements remain in development. During the period when SDS policies are emerging or under examination, their material weight in planning decision-making will be uncertain. Decisions taken in that transition period may be more susceptible to legal challenge, and conditions precedent in funding and development agreements that are tied to planning consent should reflect this uncertainty.

CONCLUSION

The policy direction is towards a more interventionist housing market, with a stronger role for councils, mayoral authorities and strategic planning bodies. Investors should prioritise early engagement with public-sector partners, re-test development and lending assumptions for policy-driven delays and infrastructure costs, and maintain active management of vacant assets. The most attractive opportunities are likely to arise where schemes deliver clear public-policy outcomes: transport-led density, affordable housing, brownfield regeneration and infrastructure-led growth.